Head race tunnel design pdf

Mar 18, 2017 the dam has the capacity to divert up to 280 m 3 s 9,888 cu fts of the neelum river, into a 28. But it was later observed that the water still had a hydraulic head of about 120 m which could be used. Frith 2 the art of tunnelling, second english edition 1973 karoly szechy. The research paper published by ijser journal is about criticalities encountered in construction of hrt head race tunnel of kameng hydro electric project 600mw, in arunachal pradesh, india. Figure 1 visualization of flow field around new helmet design. Now, here is an example to illustrate the design of lining for head race tunnel on staad. From the prefeasibility study in 2001 until the construction in 2014, there have been several changes to the pressurized headrace tunnel. Probably the most popular form of aerodynamic device is the wing. Jul 05, 2016 practices in planning, design and construction of head race tunnel of a hydroelectric project.

Practices in planning, design and construction of head. Abstracta channel tunnel, which carries the water to the penstockpressure shaft is called head race tunnel hrt. This paper presents the background for the construction of an unlined headrace tunnel at the cambas. The paper would help the design engineers with various new concepts and preparedness against geological surprises.

Introduction to tunnel design and construction seminar instructor david g. Filling and pressurizing of the headrace tunnel for the. Headrace definition of headrace by the free dictionary. Pdf design of concrete lining for head race tunnel using. It forms a balancing reservoir and maintains the head. Design of unlined headrace tunnel with 846 m head at lower kihansi, tanzania. Figure 3 wind tunnel data shows dramatic improvement 150 mph.

We believe the tunnel industry takes a pragmatic view being comfortable with an easytodetermine rmr rating. Empirical and numerical analyses for support system design in head race tunnel. World academy of science, engineering and technology. Design and construction of tunnel through such a complex and varying geology with a rock cover of more than m is a difficult and challenging taks. Cutter head main beam conveyor belt grippers thrusting cylinders shield gripper shoes guidance system. The pressure at the ogee crest remains atmospheric at the design head. Pervious pressure tunnel overburden and lateral extension 4. Design of the most optimum airfoils is trackdependent, as each track has different aerodynamic requirements. Now, calculating all the value as discussed above and putting it in staad.

Headrace tunnels definition, uses and types of headrace. Ground response studies for the design of head race tunnel. Agenda 1 introduction 2 thin cover tunneling methods 3 tunnel design factors 4 case histories 5 risk management. Depending on the topography, the penstock was installed at the surface or in a. What is the difference between headrace tunnel and. Notice federal and many state laws prohibit the removal, modification or rendering inoperative of any part or element of design affecting emissions or safety on motor vehicles used for. As the name suggests forebay is an enlarged body of. For example, as noted by kavvadas 2005, while soft ground tunnel designs often aim to minimize surface displacements, rock tunnel designs in mountainous regions often attempt to maximize these displacements so as to minimize the stresses on support structures within the tunnel. Pervious pressure tunnel overburden and lateral extension. Firstly, the overall stability of the rock slope with out the tunnels and the shafts was analyzed in 2 dimensions. Anal ouch and creampie surprise casting 11min 720p 3,621,499. The tunnel is expected to pass through muree formations of the himalayas which are influenced by regional and local faults and shear zones. Spoilers are not nearly as efficient, but because of their practicality they are used a lot.

Stability and stress analyses of headrace tunnel, upper seti storage. The project consists of two interconnected reservoirs on rangpoand rongli rivers with an installed capacity of 99mw. Criticalities encountered in construction of hrt head. A tunnel between desilting basin or forebay to surge shaft is called head race tunnel which may have pressure flow or gravity flow. A simple surge tank is a shaft connected to pressure tunnel directly or by a short connection of crosssectional area not less than the area of the head race tunnel. Accordingly, the practical tunnel engineer is interested in design rules for both shotcrete and rock bolts as a function of tunnel size as well as rock mass quality, for assessing final support requirements. Report on quality control during construction of head race tunnel of tala hydroelectric project in. That helmet was then furtherfigure 4 emerson fittipaldi wins the 1993 indianapolis 500 race. Significance of grouting for controlling leakage in water. Abstracta channeltunnel, which carries the water to the penstockpressure shaft is called head race tunnel hrt.

In such power houses the complete power house equipment are located inside cavern. Engineering geological and geotechnical investigations along. Hydropower tunnels, penstocks and surge chambers to give the future hydropower system the flexibility and behavior required to serve the demand from market, grid, bilateral power cables, new industry, new materials and advances in turbine and generator design, tunnel systems and penstocks must be designed different from the state of the art. As the name suggests forebay is an enlarged body of water in front of intake. This is one of the longest head race tunnels in india with maximum overburden height of mountain above tunnel of 1470 m, claims hcc. Pedestrian tunnels the mode of the future by don del nero, pe, cdt. Design and evaluation of a windtunnel with expanding corners 3 l2000, was built in 1963 and is still used for aeronautical research. Several stations for manual monitoring were estab lished. Just to give an idea of its size essential components of a typical tbm. The filling manual detailed procedures for the closure of each adit.

Analysis, design, and construction of tunnels and underground. The paper would help the design engineers with various new concepts and preparedness against geological surprises topics. The design and construction of grouting against water ingress in. Initially a weir was proposed to divert the water coming out of tail race tunnel of stage i and ii. Lining of pressure tunnels contents of presentation 1. Practices in planning, design and construction of head race tunnel of a hydroelectric project. It is necessary to know the general topography, geology of the area, state of stress and other mechanical properties of the strata. The tunnel would be concrete lined in its entire length. The design and construction of grouting against water. Critical assessment of rmr based tunnel design practices. The headrace tunnel runs 26 km 16 mi under the fofa mountain and at its end, it converts into a penstock with a 500 m 1,600 ft drop. The total waterway length of the project is approximately 10 kilometers hpl, 2000. The diagram below shows the relationship between these underground structures in a typical mountain tunnel. The headrace tunnel, which is the major focus of this paper, is a pressurized tunnel with maximum and minimum static water head of 4 bars and 1.

Pdf ground response studies for the design of head. Basf has been commissioned by hcc to supply concrete. Tbm whats it like just to give an idea of its size essential components of a typical tbm. At the downstream end of the head race tunnel there is also a surge chamber system. Pdf design of pressure tunnels of hydro power plant ermenek. In such power houses various tunnels such as head race tunnel for the water inflow to the turbine, tail race tunnel for water out flow of the turbine and various access tunnel have to be provided inside the hillmountain. Tbm an overview mechanical engineering nature scribd. It will be available in french and in several other languages as soon as possible. Wings can perform very efficiently by generating a lot of downforce for a small penalty in drag.

Cutter head main beam conveyor belt grippers thrusting cylinders shield gripper shoes guidance system cutter head. Read this article to learn about the following six components of hydro power plant, i. H maximum head at any point including water hammer in m, t thickness of pipe shell in mm, q flow in mss, p velocity in ms, g acceleration due to gravity in mss, p dead weight of pipe from anchor uphill to expansion joint in n, w weight of water in pipe p n. There are different definitions for headrace tunnels hrt used in different scenarios. Khimti i is a high head scheme, with a design discharge of 10. It is the overflow type spillway which has a controlled weir and is ogeeshapedsshaped in profile. Pervious pressure tunnel overburden and lateral extens. When the water reaches the power station, it powers four pelton turbines that operate. A type of surge tanks in which the inlet is throttled to improve damping of oscillations by offering greater resistance and connected to the head. The tunnel has been designed using the natm concept. Headrace tunnel anchor block surge tank penstock inlet valve tunnel inlet trashrack tunnel inlet anchor block exp. The analysis and design process included a study of the rock mass characteristics, evaluation of possible leakage, and an estimation of the grouting requirements to control any leakage from the tunnel. Headrace tunnel takes water from connecting channels and convey it to the fore bay or directly to the penstock provided with surge shaft depending upon the project and site requirements some times also known as power tunnels. Misty tries anal and is surprised when rick fills up her pussy with cum without telling her first.

It is a complex project with four dams including the largest dam on the koyna river, maharashtra hence the name koyna hydroelectric project. The project will geerate n 161 mw of firm power with an annual energy generation benefit of 3592 mu in a 90% dependable year. Sep, 2012 in such power houses the complete power house equipment are located inside cavern. Design of concrete lining for head race tunnel using staad. The design with the best combination of low lift, drag, and buffeting forces was identified. The gilgel gibe ii consists of a power station on the omo river that is fed with water from a headrace tunnel and sluice gate on the gilgel gibe river. This new version is currently available in english and spanish. The development of the f1 car is regulated by the rules sanctioned by the fia. Car aerodynamics basics and howto design tips cont aerodynamic devices cont wings. Abstract an investigation of the engineering geological properties and geotechnical parameters of rock masses along a horseshoeshaped head race tunnel hrt in the teesta stageiii hydroelectric project, sikkim, india, was carried out to analyze the rock mass. The koyna hydroelectric project is the largest completed hydroelectric power plant in india.

Design of the headrace tunnel was performed by poyry formerly. Adecors the design and construction of tunnels using the. A supersonic, a hypersonic and a ballistic windtunnel are also part of the early aeronautical research history at kth. The paper includes inputs from nathpa jhakri hydeoelectric project which is indias highest capacity 1500 mw operating hydroelectric project. Surge tanks types of surge tanks, definition and functions. Engineering geological and geotechnical investigations. Headrace tunnel is completed at tala hydro projectdespite fearing yet another delay, the 23 km headrace tunnel of the tala hydro power project in bhutan was completed on 8th november, 2004. Design and evaluation of a lowspeed windtunnel with. A tunnel between desilting basin or forebay to surge shaft is. Practices in planning, design and construction of head race. At the end of the head race tunnel there is a sand trap. Design and construction of under river crossing of head race. In order to execute the river crossing of rhep, a diversion tunnel 10. A common design is to have a surge shaft at the top of the pressure shaft.

It has a 3 m long test section of 2 2 m2 cross section and a maximum speed of 62 ms. For this purpose a knowledge of the following is indispensable. In recent years, the fia has reduced the allowable operational hours for development at the windtunnel by a f1 team. The project utilizes 300 m head where a reservoir is created by constructing approximately 150 m high asphalt core rock fill dam.

The chuzachen hydroelectric power project is located in sikkim state in northeastern part of india. Tunnel design criteria common design guidelines 2015 c26. The design of unlined hydropower tunnels and shafts. A watercourse that feeds water into a mill, water wheel, or turbine. These investigations play an important role in a tunnel design as these help in deciding the optimum layout, shape and size and support requirements of the tunnel.

The design and construction of grouting against water ingress. Barrier effect on animal populations publication no. The design of tunnels in rock can be quite different from the design of tunnels in soils. In recent years, the fia has reduced the allowable operational hours for development at the wind tunnel by a f1 team. To use this head, the kolkewadi dam was constructed at this location. Beside the sump in the tunnel floor the cross section of the tunnel is gradually increased to reduce the water velocity and allow for a better sedimentation of suspended particles.

1205 1356 511 172 1338 1432 1422 186 91 1246 122 420 218 522 598 257 1497 1114 595 966 918 905 1232 142 656 1472 46 244 1115 394 462 330 912 1082 105 1393 1345 182 1462 193 1103 873 8 324 557 1389 828 1322 1377 1304